Portfolio

All places

Portfolio health first. Pressure and patterns come next.

All places How each place is doing
Health map · 4 places
2need attention 1watch 1steady 1blocked
At risk Watch Healthy
Mato groupSorted by pressure
38
North Cafe is pulling pressure. Blocked work and handoff signals are lowering the score. Open this first.
Pressure map Which places feel the most pressure
Risk view

Pressure = high signals × 2 + other active signals. Dot size follows high signal count.

high pressure review due
10
North Cafe has the highest pressure. 5d since last read · 7 active signals · 3 high · 5 open tasks.
Pattern layer What keeps coming back
3 patterns
Map Timeline Trace AI brief
Open the full pattern map when you need filters, matrix, trace, or AI brief.
NC North CafeCafe · Trading · Variable peaks Needs attention

Vilnius · updated 2d ago · next review Friday

3 signals5 tasks1 blocked
GE Garden EspressoCafe · Trading · Stable Steady

Kaunas · updated yesterday · review due Friday

1 signal2 tasks0 blocked
RK Riverside KioskKiosk · Setup · Developing No check-in

Trakai · setup stage · opening profile incomplete

0 signals3 missing detailsdocs missing
BB Bakery BarBakery cafe · Turnaround · Seasonal Watch

Vilnius · updated 4d ago · manager follow-up needed

2 signals1 taskwaste rising
Today

Here’s what’s up

The next operating decision, not a feed.

Start here 1st
North Cafe

Handoff owner is blocked before tomorrow’s rush.

This is where stuck work, high signals, and stale read pressure meet.

1blocked 3high signals 5open tasks 5dlast read
Why this first The same handoff signal is likely to return unless ownership is named before service.
Next candidate Riverside Kiosk · first check-in missing
Pressure satellites What is pulling on today
4 signals

What needs to be untangled?

Durable plans

Work

Plans as operating boards. Tasks live inside the plan, not as a loose list.

Active plan Service readiness plan North Cafe · owner: Maya · medium depth
3/5
Progress3 tasks moving · 1 blocked
2due today 1blocked 3layers 72hstabilise
L1Stabilize
L2Manager rhythm
L3Owner view
Source: latest North Cafe check-in
Other active plans2
Plan basket 3 signals · 2 blocks · 1 tool
Calendar
Calendar Work with dates Built from task due dates, missing dates, priorities, and the active plan window.
8
8dated tasks 3missing dates 1blocked 2due this week
June 2026
1 2 3 4 5 6 7 8 11 13 14 16 17 18 19 20 21
High priority Standard Low
Jun 9Jun 16Jun 23Jun 30
North Cafe
Riverside Kiosk
OpenBlockedDone
Tasks without dates The real task workspace separates unscheduled work so it does not disappear from the calendar.
Reports Ready to send, still traceable Generate from an assessment, review Markdown or HTML, then copy, download, archive, or ask sandr to work with it.
3
2ready 1draft to review 2formats 1trace linked
North Cafe2 reports · 1 ready to send
Garden Espresso1 report · no urgent follow-up
Assessment source The real report page generates from a selected assessment and returns Markdown + HTML with trace and adapter metadata.
Bookmarks Saved things, not a junk drawer Pages, selected text, links, files, tasks, signals, blocks, and tools stay traceable to where they came from.
9
9saved items 5item kinds 3in basket 7routes linked
Search saved Same logic as the real saved drawer: title, excerpt, note, source label, tags, and kind. handoff · ops
New plan from basket The real saved drawer can open the plan basket when saved signals, blocks, or tools have context.plan_basket enabled.
Basket contents1 signal · 1 block · 1 tool · ready for preview
Saved item types Mirrors the real SavedItemKind model: page, link, text, task, article, article segment, block, signal, tool, venue, file, and other.
How things get saved The shell saves from explicit data-save attributes, selected text, links, file links, current page, and app events.
Signal map Patterns, pressure, and trace Compressed mobile version of Map, Timeline, Trace, and AI Brief without turning the screen into the full matrix.
4
4active rows 4places covered 2uncovered gaps 1brief ready
Current lens Search, venue, severity, source, and coverage are real filters in the full signal workspace. handoff · rush
Portfolio signal matrix Rows are recurring problems. Cells show where each problem is active and how severe it feels.
4 rows
Signal lifecycle Compressed version of the real timeline table: first seen, current state, active venues, and movement.
4 signals
Trace chain Selected signal path from observation to plan coverage. This is the mobile version of the full trace lens.
partial
AI brief Small mobile version of the real signal brief: what matters, why, and what sandr should help decide.
ready
Files Files vault Railway Volume storage with Postgres metadata, runtime links, proof context, and download actions.
12
12stored files 4resource roles 5proof/evidence 3unlinked
Inventory lens Venue, task, proof requirement, role, and purpose match the real files vault filters. North · proof
North Cafe7 files · 3 proof/evidence · 1 manager signoff
Riverside Kiosk2 files · setup profile incomplete
Upload evidence file The real upload form accepts file, venue, creator, task id, proof requirement id, and proof purpose before posting FormData.
VenueNorth Cafe Task IDhandoff-owner Proof requirementmanager_signoff Purposeproof / photo_proof / evidence

Field note

File viewer Railway Volume · Postgres metadata
File preview
North Cafe
Trading · manager led 8 FOH · 4 BOH · 2 shift leads · variable peaks
72
Next move Assign handoff owner before tomorrow morning rush. This unblocks the active service-readiness plan.
Current signals
Prep delayHigh confidence · visible in recent check-in
Handoff unclearHigh confidence · linked to service rush
Waste spikesandr suspects · needs confirmation
Current plan Service readiness · Medium depth · 5 tasks · 1 blocked
Place profile Concept, address, contacts, team, opening hours, documents, and reports.
contactsteamhoursdocuments